April - 2013
The grid coupling of a large water pump at Sheffield Forgemasters Engineering Ltd. (S.F.E.L.) was coming to the end of its operational life. To avoid costly re-engineering of the pump S.F.E.L. wanted to commission a bespoke coupling to match the original’s footprint.
Read More
A private college needed to replace an inefficient adjustable speed drive, which incorporated three classical v-belts, on an HVAC exhaust fan in their natural sciences building. As one of the initiatives within their Resource and Environmental Management Program, the college is constantly looking for ways to improve energy efficiencies and reduce costs.
Read More